收稿日期: 2013-01-15
修回日期: 2013-03-11
网络出版日期: 2013-11-15
基金资助
国家重点基础研究发展计划(973)项目(2012CB933200)资助
Heat transfer characteristics of railway switches equipped with electric heating snow-melting systems
Received date: 2013-01-15
Revised date: 2013-03-11
Online published: 2013-11-15
李兰兰 , 梁世强 , 唐大伟 , 陈伟 , 成克用 . 基于电加热融雪系统的道岔结构传热特性[J]. 中国科学院大学学报, 2013 , 30(6) : 744 -750 . DOI: 10.7523/j.issn.2095-6134.2013.06.005
We study the heat transfer performance of the railway switches and establish a calculation model for minimum heating power at different snow melting positions under different environment conditions. The calculation model provides the reliable theory for the engineering applications of electric heating snow-melting system.
[1] Wang T. Design and practice of electrical-heating snow-melting system for switch[J]. Railway Signalling and Communication, 2010, 46(7):37-40 (in Chinese). 王涛. 电加热道岔融雪系统设计与实践[J]. 铁道通信信号,2010,46 (7):37-40.
[2] Wang J Z, Zhang Y L. Design and suggestion of electric heating switch snow-melting system for high-speed railways[J]. Railway Signalling and Communication Engineering, 2011,8 (2):37-40 (in Chinese). 王锦忠,张玉林. 高速铁路电加热道岔融雪系统工程设计与建议[J]. 铁路通信信号工程技术,2011,8 (2):37-40.
[3] Dong Y Y, Chen Y G, Wang Y J. Study of the RD1 turnout snow-melting system's reliability[J]. Railway Operation Technology, 2012,18(1):41-44 (in Chinese).董玉英,陈永刚,王亚军. RD1道岔融雪系统的可靠性研究[J]. 铁道运营技术,2012,18(1):41-44.
[4] Sun Y H. Research on application of STDR-G type electric heating turnout snow melting system[J]. Chinese Railways, 2011, (6): 30-32 (in Chinese). 孙衍海. STDR-G型电热道岔融雪系统的应用研究[J]. 中国铁路,2011,(6):30-32.
[5] Luo X G, Liu J G. Application of CRHT rail turnout snow-melting system on railways in Xinjiang[J]. Chinese Railways, 2008, (9):67-71 (in Chinese). 骆新光,刘建国. CRHT型钢轨道岔融雪系统在新疆铁路的应用[J]. 中国铁路,2008, (9):67-71.
[6] 沈维道,蒋智敏,童钧耕. 工程热力学[M]. 北京:高等教育出版社,2001.
[7] 陶文铨. 数值传热学[M]. 西安:西安交通大学出版社,1988.
[8] Ramamoorthy M. Application of hybrid ground source heat pump systems to buildings and bridge decks[D]. Coimbatore, India: Government College of Technology,1996.
[9] Wang H J, Zhao J, Chen Z H. Experimental investigation of ice and snow melting process on pavement utilizing geothermal tail water[J]. Energy Conversion and management, 2008, 49(6): 1538-1546.
[10] Chen Y H, Zhang Z Y, Jing B G. Trial algorithm applied on multi-dimensional transient heat conduction[J]. Construction Conserves Energy, 2010,227(38):68-70(in Chinese). 陈艳华,张振迎,景宝国. 试算法在多维非稳态导热问题中的应用[J]. 建筑节能,2010,227(38):68-70.
[11] Guan S Y. A simulation study of electric cable heating system used in de-snowing[D]. Shanghai: Shanghai Jiao Tong University, 2008(in Chinese). 管数园. 电缆加热系统进行融雪的数值分析研究[D]. 上海:上海交通大学,2008.
/
| 〈 |
|
〉 |