[1] 金光,武小悦,高卫斌.卫星地面站资源调度优化模型及启发式算法[J].系统工程与电子技术,2004,26(12):1839-1841,1875. DOI:10.3321/j.issn:1001-506X.2014.12.026. [2] 金光,武小悦,高卫斌.基于冲突的卫星地面站系统资源调度与能力分析[J].小型微型计算机系统,2007,28(2):310-312. DOI:10.3969/j.issn.1000-1220.2007.02.026. [3] 王远振,高卫斌,聂成.多星地面站系统资源配置优化研究综述[J].系统工程与电子技术,2004,26(4):437-439,453. DOI:10.3321/j.issn:1001-506X.2004.04.005. [4] Gooley T D. Automating the satellite range scheduling process.Ohio:Air Force Institute of Technology, 1993. [5] Gooley T D, Borsi J J, Moore J T. Automating air force satellite control network (AFSCN) scheduling[J]. Mathematical and Computer Modelling, 1996, 24(2):91-101. DOI:10.1016/0895-7177(96)00093-3. [6] Schalck S M. Automating satellite range scheduling.Ohio:Air Force Institute of Technology, 1993. [7] 贺仁杰.成像侦察卫星调度问题研究.长沙:国防科学技术大学,2004. [8] 刘洋,陈英武,谭跃进.卫星地面站系统任务调度的动态规划方法[J].中国空间科学技术,2005,25(1):44-47. DOI:10.3321/j.issn:1000-758X.2005.01.008. [9] Pemberton J C, Galiber F. A constraint-based approach to satellite scheduling[J]. DIMACS Series in Discrete Mathematics and Theoretical Computer Science, 2001, 57:101-114. [10] Pemberton J C. Towards scheduling over-constrained remote sensing satellites//Proceedings of the 2d International Workshop on Planning and Scheduling for Space. San Francisco, 2000:84-89. [11] Zhang J W, Xing L N, Peng G S, et al. A large-scale multi-objective satellite data transmission scheduling algorithm based on SVM+NSGA-Ⅱ[J]. Swarm and Evolutionary Computation, 2019, 50:100560. DOI:10.1016/j.swevo.2019.100560. [12] 王远振,赵坚,聂成.多卫星-地面站系统的Petri网模型研究[J].空军工程大学学报(自然科学版),2003,4(2):7-11. DOI:10.3969/j.issn.1009-3516.2003.02.002. [13] 王远振,赵坚,聂成.多星地面站设备优化调度方法研究[J].计算机仿真,2003,20(7):17-19,54. DOI:10.3969/j.issn.1006-9348.2003.07.006. [14] 王远振,赵坚,聂成.任务优先级调度策略性能分析[J].空军工程大学学报(自然科学版),2003,4(3):31-35. DOI:10.3969/j.issn.1009-3516.2003.03.008. [15] 王远振,赵坚,聂成,等.卫星地面站设备配置效能评价指标体系研究[J].军事运筹与系统工程,2003,17(1):59-64. DOI:10.3969/j.issn.1672-8211.2003.01.015. [16] 张帆,王钧,李军,等.基于时间序无圈有向图的多准则优化成像调度[J].国防科技大学学报,2005,27(6):61-66. DOI:10.3969/j.issn.1001-2486.2005.06.014. [17] 陈慧中,王钧,李军,等.卫星成像规划调度系统中的可视化决策支持研究与实现[J].计算机工程与科学,2007,29(7):58-61. DOI:10.3969/j.issn.1007-130X.2007.07.018. [18] 李云峰,武小悦.基于综合优先度的卫星数传调度算法[J].系统工程学报,2007,22(6):644-648. DOI:10.3969/j.issn.1000-5781.2007.06.014. [19] 李云峰,武小悦.基于试探性的卫星数传任务调度算法研究[J].系统工程与电子技术,2007,29(5):764-767. DOI:10.3321/j.issn:1001-506X.2007.05.025. [20] Burrowbridge S E. Optimal allocation of satellite network resources. Blacksburg, VA, USA:Virginia Polytechnic Institute and State University, 1999. [21] 李云峰,武小悦.遗传算法在卫星数传调度问题中的应用[J].系统工程理论与实践,2008,28(1):124-131. DOI:10.3321/j.issn:1000-6788.2008.01.018. [22] Sun J, Xhafa F. A genetic algorithm for ground station scheduling//Proceedings of the 2011 International Conference on Complex, Intelligent, and Software Intensive Systems. June 30-July 2, 2011, Seoul, Korea (South). IEEE Computer Society, 2011:138-145. DOI:10.1109/CISIS.2011.29. [23] 刘民.基于数据的生产过程调度方法研究综述[J].自动化学报,2009,35(6):785-806. DOI:10.3724/SP.J.1004.2009.00785. [24] 吴启迪,乔非,李莉,等.基于数据的复杂制造过程调度[J].自动化学报,2009,35(6):807-813. DOI:10.3724/SP.J.1004.2009.00807. [25] Koonce D A, Tsai S C. Using data mining to find patterns in genetic algorithm solutions to a job shop schedule[J]. Computers&Industrial Engineering, 2000, 38(3):361-374. DOI:10.1016/S0360-8352(00)00050-4. [26] Youssef H, Brigitte M, Noureddine Z. A genetic algorithm and data mining to resolve a job shop schedule//Proceedings of the 8th IEEE International Conference on Emerging Technologies and Factory Automation. October 15-18, 2001, Antibes-Juan les Pins, France. IEEE, 2001:727-728. DOI:10.1109/ETFA.2001.997768. [27] Harrath Y, Chebel-Morello B, Zerhouni N. A genetic algorithm and data mining based meta-heuristic for job shop scheduling problem//IEEE International Conference on Systems, Man and Cybernetics. October 6-9, 2002, Yasmine Hammamet, Tunisia. Tunisia:IEEE, 2002:280-285. DOI:10.1109/ICSMC.2002.1175709. [28] Feng S, Li L, Cen L, et al. Using MLP networks to design a production scheduling system[J]. Computers&Operations Research, 2003, 30(6):821-832. DOI:10.1016/s0305-0548(02)00044-8. [29] Weckman G R, Ganduri C V, Koonce D A. A neural network job-shop scheduler[J]. Journal of Intelligent Manufacturing, 2008, 19(2):191-201. DOI:10.1007/S10845-008-0073.9. [30] Kumar S, Rao C S P. Application of ant colony, genetic algorithm and data mining-based techniques for scheduling[J]. Robotics and Computer-Integrated Manufacturing, 2009, 25(6):901-908. DOI:10.1016/j.rcim.2009.04.015. [31] Shahzad A, Mebarki N. Data mining based job dispatching using hybrid simulation-optimization approach for shop scheduling problem[J]. Engineering Applications of Artificial Intelligence, 2012, 25(6):1173-1181. DOI:10.1016/j.engappai.2012.04.001. [32] 王成龙,李诚,冯毅萍,等.作业车间调度规则的挖掘方法研究[J].浙江大学学报(工学版),2015,49(3):421-429,438. [33] 王振江.作业车间调度属性选择及调度规则挖掘方法研究.北京:北京化工大学,2016. [34] 丁建立,王曼.基于关联规则挖掘的航班协同保障数据知识发现研究[J].计算机应用与软件,2016,33(11):21-23,61. DOI:10.3969/j.issn.1000-386x.2016.11.005. [35] Vinyals O, Fortunato M, Jaitly N. Pointer networks//Proceedings of the 28th International Conference on Neural Information Processing Systems-Vol 2. Cambridge, MA, USA:MIT Press, 2015:2692-2700. [36] Bello I, Pham H, Le Q V, et al. Neural combinatorial optimization with reinforcement learning. arXiv:1611.09940(2017-01-12).. https://arxiv.org/abs/1611.09940. [37] Sutskever I, Vinyals O, Le Q V. Sequence to sequence learning with neural networks//Advances in Neural Information Processing Systems, 2014:3104-3112. [38] Lin K X, Zhao R Y, Xu Z, et al. Efficient large-scale fleet management via multi-agent deep reinforcement learning//The 24th ACM SIGKDD International Conference on Knowledge Discovery&Data Mining. London:ACM, 2018:1774-1783. DOI:10.1145/3219819.3219993. [39] Hochreiter S, Schmidhuber J. Long short-term memory[J]. Neural computation, 1997, 9(8):1735-1780. DOI:10.1162/neco.1997.9.8.1735. [40] Srivastava N, Hinton G E, Krizhevsky A, et al. Dropout:a simple way to prevent neural networks from overfitting[J]. Journal of Machine Learning Research, 2014, 15(1):1929-1958. |